Walberton PC's response to the A27 Consultation

2024 Letter to National Highways

In March 2024, the Parish Council wrote to National Highways and other relevant parties to raise our concerns that we were not being consulted to the same degree as other consultees.

Download response as PDF
Letter

 

 

Responses made in 2022

The main document can be read here:

 

Download response as PDF
Covering letter
Download response as PDF
Consultation response

 

This refers to several other documents.  The links within the document will not work at the moment, but you can view them directly here.

Download response as PDF
Appendix 1

Appendix 1

A report concerning National Highways' attempts to 'scope out' bats from the Arundel Bypass scheme

Download response as PDF
Appendix 2

Appendix 2

A discussion of the problems with Road Drainage and the Water Environment presented by the proposed scheme

Download response as PDF
Appendix 3

Appendix 3

A letter concerning the Ford Road junction, traffic and lack of value for money of the proposed scheme

Download response as PDF
Appendix 4

Appendix 4

A discussion of traffic and misconstrued benefits

Download response as PDF
Appendix 5

Appendix 5

A letter to Andrew Jackson of National Highways concerning the horrendous traffic impacts the scheme is forecast to have in Walberton and at Fontwell

Download response as PDF
Appendix 6

Appendix 6

A letter critiquing the proposal and providing details of a better alternative

Download response as PDF
Appendix 7

Appendix 7

Mitigation proposals being considered by WPC

Whilst WPC has included independent reports submitted to WPC by third party representations, and accept them as valid reflections of opinion based on available information at time of submission, assertions and conclusions may not have been independently verified in their entirety and WPC does not take responsibility for any inaccuracies therein.